I took the weekend off and now it has rained two days in a row. But I wanted to do something on the project tonight even though as you can see in the picture above it is very wet. So I cut and installed the re-rod in the two forms I completed last week. I used a hammer drill to bore 3/8" holes in the concrete and then tapped the re-rod snuggly into place. Now if the weather would clear up long enough to pour the concrete.