September 29, 2004

I got a late start tonight but was able to get the small warm room stripped out and ready demolition. I moved out the small parts drawers that were left from last night and then shut off the poser and stripped out the baseboard heat, lighting, and outlets. Then I removed the bench and other shelving, leaving only the four walls. I also removed the door that was the original door hanging in the opening when we moved in and it will go right to the burn pile. I removed the eight foot high shelf unit screwed to the outside wall of the warm room and it was the last load headed for the new shop. I will use this unit as is until I have time to get started on new shelving and cabinets.