August 8, 2005

The projects tonight are not very showy, but nonetheless important. I started by filling in the space below the walk-in door. I had left this piece out until the concrete was poured since I wanted it raised off the concrete. If I need to replace the door this piece needs to be replaceable and is much easier to remove if it is not in contact with the concrete. I covered the seams with the plinth blocks on each side of the door. The other project was to hang and fit the screen door. I had previously rough-cut it to the appropriate size, now I had planed it to fit all the way around. The final project was to prime the raw wood surfaces from fitting it.

Current Project Page

Main Page

Next Page