August 5, 2003

I hurried home from work at so that I could get home and at least cover up the I joist that were lying in the rain. It rained off and on all day and I hated to leave the joist setting there soaking up the water. It had stopped sprinkling when I got home so I finished filling and tamping the north wall footing and capped it off with the 2 X 8. I then moved the rest of the pressure treated material to the joist pile and covered the entire pile with blue tarps. I also mowed the material pile grass to clean things up a bit.

Current Project Page

Main Page

Next Page